ZALMAN ZM-GWB3 Specifications Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 18
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
RESERATOR 2
12
The specifications of any product may change without prior notice to improve performance.
5. 10 Connect DC Power Cable
1) Fit the DC Cable’s Cord Bushing into the groove of the I/O Bracket, and fasten the I/O
Bracket with the use of Bolts.
2) Connect the DC Cable connector to the 4-Pin connector of the Power Supply.
Note 1) Do not exert excessive force when connecting the connector.
Slowly connect with two hands.
5. 11 Installing the Northbridge Water Block
1) To install the Northbridge Water Block, connect as shown in the diagram below.
2) Remember to install Tube Clamps on the PVC Tubes during installation.
CPU Water Block
Tube Clamp
Northbridge Water Block
VGA Water Block
I/O Bracket
Cord Bushing
Bolt
4-Pin
Connecter
DC Cable Connecter
4) Plug the Quick Coupling Insert into the Base OUT located on the lower part of the Reserator
Base OUT, Quick Coupling Body
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 18

Comments to this Manuals

No comments